ITKM
505 Final
Project Requirements:
1. Add a page to your spreadsheet called
“PT_CT” (Pivot Table for Cleaning Time) and create a pivot table of all the
data on the analysis layer page (AL!C19:AT12867).
2. The Rows and Values should be the
field called Clean Time Cat. The Filters
should be as shown in Figure 1.
Figure
1.
3. Add a new worksheet called “PL”
(Presentation Layer) as shown in Figure 2.
[LClick the circled “+” sign, change the name of the new sheet to “PL”
and move it to the end of the list of worksheets. As usual, to get a menu of things to do with
a Windows Excel sheet, RClick on what it is you want to work with.]
Figure
2.
4. Create a column graph from the data
in PT_CT!A9:B16. It should look like
Figure 3.
Figure
3.
Figure
4.
Get Free Quote!
255 Experts Online