Build the most cost effective 24 hour schedule for Suez Town water distribution network, while making sure each tank ends up with the same or similar volume of water as in the beginning of the day

others

Description

This project is based on the case study provided by SUEZ Smart Solutions (Derceto Ltd) in class on 31 August 2020. It will contribute 40% towards the final mark for STAT804.


Part 1: Build the most cost effective 24 hour schedule for Suez Town water distribution network, while making sure each tank ends up with the same or similar volume of water as in the beginning of the day (starts at 6:00am).


Part 2: Cost Benefit Analysis 

• What benefit could be achieved by upgrading some or all of these pumps to more efficient modern pumps? Note 1: Each of the pumps at Kingsland PS and Cornwall PS is assumed to operate at 65% efficiency. Note 2: Brand new modern pumps operation at 85% efficiency. 


• The town is in Lockdown Due to a global pandemic the town is in lockdown. New water usage patterns emerge. Ellerslie and Penrose have increased in usage by 50% each, however Newmarket – an industrial and commercial zone is almost deserted drop of water consumption by 90%. This new pattern of consumption brings new infrastructure, water quality and optimization challenges.