HCS Project
The
tasks for this project are as follows:
1.
Develop
a physical design for the intersection, that is, how many lanes and what channelization for the lanes.
2.
Develop
a complete signal timing plan – assume a pre-timed signal.
3.
Using
HCS software, run an HCM analysis of how the intersection is expected to
operate under the proposed design and signal timing. You may not have any lane
groups with LOS of E or F. You do not
want lane group v/c ratios greater than 0.95
4.
The
fewer lanes you use and still keep a LOS of D or better, the higher your grade.
5.
Make
sure the design works in the simulation
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
23 | 24 | 25 | 26 | 27 | 28 | 1 |
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 | 31 | 1 | 2 | 3 | 4 | 5 |
Get Free Quote!
355 Experts Online