In accordance with ARM 4 take off the quantities, including the provision of a take-off / approach list and RFI list if appropriate, for all items in connection with Element (27) Roof Structure as outlined on the attached drawing(s):

engineering

Description

In accordance with ARM 4 take off the quantities, including the provision of a take-off / approach list and RFI list if appropriate, for all items in connection with Element (27) Roof Structure as outlined on the attached drawing(s):


Specification: Roof Timbers Sawn softwood; pressure impregnated with preservative; all IS144 C16 - 18 or equivalent; in strict accordance with the Architects drawings and specifications Straps and hangers; galvanised mild steel, Ref. "Bat" or equivalent wallplate holding down strap, 150 mm bend at one end, predrilled; 1000 x 30 x 5mm overall


Related Questions in engineering category