ACTG 3020
MANAGERIAL ACCOUNTING
MASTER BUDGET PROJECT
Phase II: 100 Points (Note: You
may do the Connect alternative by yourself for the same points)
Note: Obtain
a copy of the Excel file from my D2L site from the Projects folder. I have
provided headings for most budgets and schedules necessary for Phase II in the
attached file.
You must prepare individual budgets
and schedules (ALL included
in Chapter 8 of the text) to complete your master budget. Your assumptions page
will look similar to the one in the book (also found in the word doc I posted
of budgets for CH8). I have also included this on a “sample assumptions” tab
for your convenience. Be sure to include company and group members’ names. The budget
will be for 2018 in quarterly detail and in total. To simplify the assignment, assume
your company will start operation on January 1, 2020. This means you will
have NO (0) beginning
inventory, A/P, A/R. So your budgets will look a little different than the one we
did in class for practice.
Begin each budget or schedule on the
left hand side of your spreadsheet. This will assist me in grading your
projects. Remember in your budgets, link to the assumptions page and from
one budget to the other in as many places as possible.
Remember that I want a budget for
each quarter and a total for the year. You may have to use the first two
quarters of the next year (assume the sales # on assumptions tab) to figure out
some ending inventory values.
1) Sales
Budget
Determine
your budgeted sales per quarter in units and the sales price per unit (through
2nd quarter 2021, so 6 quarters total). All the rest of the budgets
will flow from this budget. Make sure all budgets are linked in your
spreadsheet.
2) Schedule
of Cash Collections
The
schedule of cash collections should depend on your credit policies. You must
assume a cash collection pattern for credit sales. Put this in your assumptions
tab. Link to sales budget.
3) Production
Budget
Develop
your production budget (through 1st quarter 2021) based on established
finished goods inventory policy as a percentage of the next quarter’s sales.
4) Direct
Materials Budget
You must
develop a direct materials budget for each of your raw materials. (Calculate
production needs through 1st quarter 2021) You must use a stated raw
materials inventory policy based on next quarter’s raw materials needs. Include
a cost per unit for your raw materials. (I have included -0- beginning 1st
quarter inventories because you are starting business on that date.)
5) Schedule
of Cash Disbursements
The
schedule of cash disbursements should reference the total dollar amount of
purchases of both raw materials. (Just complete one schedule of cash
disbursements.) You must assume a cash payment pattern for credit purchases. Link
to production budget.
6) Direct
Labor Budget
7) Manufacturing
Overhead Budget
Prepare a manufacturing overhead
budget. Use direct labor hours as a base to apply overhead. Direct labor hours
will be the simplest and easiest base to use because you already have prepared
a direct labor budget. Notice that you will have a variable cost per input unit
(direct labor hour or machine hour) for each variable manufacturing overhead
item and total variable manufacturing overhead per input unit. Note that the
indirect labor cost is per direct labor hour or machine hour, not per indirect
labor hour. Just link to the total variable cost per input unit amount for your
variable manufacturing overhead rate at the bottom of the budget. You will also
have quarterly fixed overhead amounts by item and total fixed overhead per
quarter. Include a predetermined fixed overhead rate calculation at the bottom
of the budget.
8) Selling
and Administrative Expenses Budget
Prepare
the selling and administrative expenses budget in detail.
Grading: Each budget is 11 points
(88 total), 5 points for assumptions tab and 7 points for
formatting/readability. Your grade may also be adjusted based on feedback from
your team members on your participation, etc. This is at my discretion.
For Phase II, there is a dropbox on
D2L for the Excel file that includes all of the linked budgets and schedules as
well as a detailed Assumptions tab. I need ONE file per group in the dropbox BY
11:59pm on the due date on your class schedule.