PROJECT ASSIGNMENTS SCENARIO

business

Description

Deadline: 

Project: Communication Plan—Utilizing PMBOK, the course text, and the discussion with your classmates in Modules/Weeks 3–4, develop a Communication Plan for the Anchorage, AK Technology Project. Use PMBOK as your guide to what to include.
You must submit this assignment by 11:59 p.m. (ET) on Monday of Module/Week 4.


Download Attachment: 
BUSI415_Project_Assignment_Scenario-2.docx

PROJECT ASSIGNMENTS SCENARIO


You have been assigned to the Project Manager role for a project in Anchorage, Alaska where it

snows 12” daily (or so it seems), and sometimes reduces air traffic to 1 flight in and 1 flight out

daily.

The city wishes to upgrade its technology center with current hardware and software, and hand

off 24-hour phone support to a vendor based in India. The core project team is located in

Anchorage and consists of the following:

  •  The Project Sponsor is the Mayor, Dan Sullivan.
  •  In addition to the mayor, you have the current technology director and 4 technicians.

  •  The Technology Director is Mitch Stevens. Mitch is very knowledgeable and

knows the current center inside and out. He is an introvert who stores everything

in his head and loves to hunt.

  • The 4 Technicians are Brad (new to the team), Katie (a 5-year veteran who is 5

months pregnant), and Bob and Mick (local college students).


  •  The Procurement Team is located in Juno. As it supports the entire state, they stay busy

procuring for everyone.

  •  All hardware will be made to order and is to be built by Dell.
  •  Juno is in the middle of their city technology center upgrade and may have

enough hardware to cover Anchorage, as they changed plan mid-project.

However, you won’t know for another month or 2 what, if anything, may be

available.

  •  COTS software will be used where possible, but there is 1 application that connects all units in the building which has not yet been developed.
  •  The Development and Testing Teams are located in Delhi, India.
  •  Their lead team Project Manager is Kumar, and he is located in Alaska with you.

He will also be the lead for the support team that needs to be assembled and

trained, but those contracts have not yet been signed. You will need to make sure

this happens.


The project will be completed in 6 months and cost $500k and is scheduled to start in 1 month.

You will need to create a high-level project plan (Requirements, Design, Build, Test, and Release)

to support your work, add resources and cost (assumed – this is not graded) to each section, to

support your work. Use this timeline. PROJECT ASSIGNMENTS SCENARIO


You have been assigned to the Project Manager role for a project in Anchorage, Alaska where it

snows 12” daily (or so it seems), and sometimes reduces air traffic to 1 flight in and 1 flight out

daily.

The city wishes to upgrade its technology center with current hardware and software, and hand

off 24-hour phone support to a vendor based in India. The core project team is located in

Anchorage and consists of the following:

  •  The Project Sponsor is the Mayor, Dan Sullivan.
  •  In addition to the mayor, you have the current technology director and 4 technicians.

 The Technology Director is Mitch Stevens. Mitch is very knowledgeable and

knows the current center inside and out. He is an introvert who stores everything

in his head and loves to hunt.

o The 4 Technicians are Brad (new to the team), Katie (a 5-year veteran who is 5

months pregnant), and Bob and Mick (local college students).


  • The Procurement Team is located in Juno. As it supports the entire state, they stay busy

procuring for everyone.

  •  All hardware will be made to order and is to be built by Dell.
  •  Juno is in the middle of their city technology center upgrade and may have

enough hardware to cover Anchorage, as they changed plan mid-project.

However, you won’t know for another month or 2 what, if anything, may be

available.


o COTS software will be used where possible, but there is 1 application that

connects all units in the building which has not yet been developed.

The Development and Testing Teams are located in Delhi, India.

o Their lead team Project Manager is Kumar, and he is located in Alaska with you.

He will also be the lead for the support team that needs to be assembled and

trained, but those contracts have not yet been signed. You will need to make sure

this happens.


The project will be completed in 6 months and cost $500k and is scheduled to start in 1 month.

You will need to create a high-level project plan (Requirements, Design, Build, Test, and Release)

to support your work, add resources and cost (assumed – this is not graded) to each section, to

support your work. Use this timeline.


Related Questions in business category


Disclaimer
The ready solutions purchased from Library are already used solutions. Please do not submit them directly as it may lead to plagiarism. Once paid, the solution file download link will be sent to your provided email. Please either use them for learning purpose or re-write them in your own language. In case if you haven't get the email, do let us know via chat support.