Deadline:
Project: Communication Plan—Utilizing PMBOK, the course text, and the discussion with your classmates in Modules/Weeks 3–4, develop a Communication Plan for the Anchorage, AK Technology Project. Use PMBOK as your guide to what to include.
You must submit this assignment by 11:59 p.m. (ET) on Monday of Module/Week 4.
Download Attachment:
BUSI415_Project_Assignment_
PROJECT ASSIGNMENTS SCENARIO
You have been assigned to the Project Manager role for a project in Anchorage, Alaska where it
snows 12” daily (or so it seems), and sometimes reduces air traffic to 1 flight in and 1 flight out
daily.
The city wishes to upgrade its technology center with current hardware and software, and hand
off 24-hour phone support to a vendor based in India. The core project team is located in
Anchorage and consists of the following:
knows the current center inside and out. He is an introvert who stores everything
in his head and loves to hunt.
months pregnant), and Bob and Mick (local college students).
procuring for everyone.
enough hardware to cover Anchorage, as they changed plan mid-project.
However, you won’t know for another month or 2 what, if anything, may be
available.
He will also be the lead for the support team that needs to be assembled and
trained, but those contracts have not yet been signed. You will need to make sure
this happens.
The project will be completed in 6 months and cost $500k and is scheduled to start in 1 month.
You will need to create a high-level project plan (Requirements, Design, Build, Test, and Release)
to support your work, add resources and cost (assumed – this is not graded) to each section, to
support your work. Use this timeline. PROJECT ASSIGNMENTS SCENARIO
You have been assigned to the Project Manager role for a project in Anchorage, Alaska where it
snows 12” daily (or so it seems), and sometimes reduces air traffic to 1 flight in and 1 flight out
daily.
The city wishes to upgrade its technology center with current hardware and software, and hand
off 24-hour phone support to a vendor based in India. The core project team is located in
Anchorage and consists of the following:
The Technology Director is Mitch Stevens. Mitch is very knowledgeable and
knows the current center inside and out. He is an introvert who stores everything
in his head and loves to hunt.
o The 4 Technicians are Brad (new to the team), Katie (a 5-year veteran who is 5
months pregnant), and Bob and Mick (local college students).
procuring for everyone.
enough hardware to cover Anchorage, as they changed plan mid-project.
However, you won’t know for another month or 2 what, if anything, may be
available.
o COTS software will be used where possible, but there is 1 application that
connects all units in the building which has not yet been developed.
The Development and Testing Teams are located in Delhi, India.
o Their lead team Project Manager is Kumar, and he is located in Alaska with you.
He will also be the lead for the support team that needs to be assembled and
trained, but those contracts have not yet been signed. You will need to make sure
this happens.
The project will be completed in 6 months and cost $500k and is scheduled to start in 1 month.
You will need to create a high-level project plan (Requirements, Design, Build, Test, and Release)
to support your work, add resources and cost (assumed – this is not graded) to each section, to
support your work. Use this timeline.
Get Free Quote!
361 Experts Online