STEAM PLANT EXPANSION Project Management Plan

management

Description

Executive Summary

2 points; The following are notes about the company only. Yellow highlights indicate format issues that will be corrected at download and editing.

 

Background

 

Creative Energy’s steam utility has been in operation since 1968.  Their steam plant is located at 720 Beatty Street, and has six gas-fired boilers. Two, smaller steam to hot water converter stations are located in the North East False Creek (NEFC) area. The company also owns and maintains approximately 14 km of steam distribution mains in downtown Vancouver, and hot water distribution mains in NEFC2. The existing steam plant serves over 210 buildings in Vancouver’s downtown core and provides the lowest cost source of energy in the city.

 

Of the 6 gas-fired boilers, 4 are at the end of life or approaching end of life. However, because of lack of capacity to meet existing demand during cold months (high season), the boilers cannot be replaced without increasing capacity first.


Related Questions in management category


Disclaimer
The ready solutions purchased from Library are already used solutions. Please do not submit them directly as it may lead to plagiarism. Once paid, the solution file download link will be sent to your provided email. Please either use them for learning purpose or re-write them in your own language. In case if you haven't get the email, do let us know via chat support.