There are three factories on the Momiss river: 1, 2, 3. Each factory emits two type of pollutants labeled P1 and P2, into the river.

business

Description

After graduation, you are hired as environmental consultant, in charge of pollution control programs in the state. Your first task is to decide how to reduce pollution in the Momiss river at minimum cost.

 

There are three factories on the Momiss river: 1, 2, 3. Each factory emits two type of pollutants labeled P1 and P2, into the river. If the waste from each factory is processed, the pollution in the river can be reduced. It costs $150 to process a ton of factory 1 waste, and each ton processed reduces the amount of P1 by 0.10 ton and the amount of P2 by 0.45 ton. It costs $100 to process a ton of factory 2 waste, and each ton processed will reduce the amount of P1 by 0.20 ton and the amount of P2 by 0.25 ton. It costs $120 to process a ton of factory 3 waste, and each ton processed will reduce the amount of P1 by 0.40 ton and the amount of P2 by 0.30 ton. The state wants to reduce the amount of P1 in the river by at least 30 tons and the amount of P2 by at least 40 tons.

 

NOTE: The pollutants must be reduced in whole tons. (fractional tons is not possible)

 

a.     Set up the Excel model.

b.     Enter your Name, date, and Assignment 3 at the top of the worksheet.

c.      Use Excel Solver to determine the minimum cost of reducing pollution by the desired amount.

d.     Create an answer report, detailing the parameters of the problem and the optimal solution.

 