Manufacturing and Construction Management Department
CM353 – Introduction to Surveying
Spring 2020
Project
work
Due
date: May 5, 2020 Name:
1. A theodolite is set up at point
#2, with given coordinates:
a, What are the coordinates of
corner #4 ?
b, What is the clockwise angle
between line 2..1 and line 2..3
c, What is the distance from
point # 1 to point #3 ?
(Show your work clearly) [5 points]
2. Given the profile data shown
below, prepare a set of field notes: reduce and prove the notes with arithmetic
check. (Show your work) [5
points]