Windows Server 2012 Deployment Proposal **** Please only take this assignment if you are able to meet all the requirements**** Overview Create a detailed, organized, unified technical solution given the scenario described below. The submission will be in a written format, with at least one diagram, and may include additional diagrams, charts or tables.
Global Advertising, Inc. (referred to as “GAI”) has hired you as an IT consultant for implementing their Windows network infrastructure. GAI is a new advertising firm, and they are currently hiring staff, establishing two locations, and have a need to get their internal IT services configured. They do not yet have an IT staff, but when they do, the IT staff will take over all aspects of IT administration. You are required to supply GAI with a solution which describes the implementation and configuration of their core IT services. Cost is not a significant concern – GAI wishes to implement the “right” solution to fit their needs now and for the next 2-3 years.
The outline below contains recommended points to cover. You are free to add other related information.
There are specific requirements for the assignment: The final submission should contain at least 6 pages’ worth of text written by the student (not counting title page, images, diagrams, tables, or quotations), but may be longer, not to exceed approximately 10 pages’ worth of student-supplied text. (With the required diagram, and other images, title page, etc., the final submission may end up being more than 10 pages in length.) It must be double-spaced, have 1-inch margins, and use 12-point Times New Roman or 10-point Arial/Helvetica font. A title page is required; APA format for the title page is optional.
Download Attachment:
Windows Server Deployment Proposal.docx
Scenario
There are several details about GAI which will have an impact on your choices:
GAI will start with 90 employees, in the following departments:
Executives (9 employees) – manage and run the company
Accounts and Sales Department (15 employees) – perform market research and maintain accounts
Creative, Media and Production Department (49 employees) – advertising
Human Resources and Finances (12 employees) – perform HR and financial duties
IT (5 employees) – manage IT for the company
GAI will have two sites, one in Los Angeles and one in New York. Most staff will be located in LA, with at least 1 person from each of the departments above located in NY.
Networking equipment is already in place for both sites. A secure tunnel (using IPSec) will be established between the two sites so that inter-site traffic will be securely tunneled over the Internet. You may make whatever other assumptions you wish about intra-and inter-site connectivity.
Security mechanisms (e.g., firewalls, intrusion detection) will be handled separately, and there is no need to describe them.
Some departments will want their data to remain private from other departments (e.g., Finances personnel will not want Production staff to see the company’s financial details). Your team may make assumptions about how data should be shared or kept private.
Assumptions can be made regarding any information not included here; all assumptions should be identified, however.
Topics to Cover
Describe the technical and business reasons for each choice, citing other resources as appropriate.
The Windows Server 2012 operating system should be used for all aspects of the solution.
The topics include:
New Features of Windows Server 2012
Describe new features of Windows Server 2012 that GAI can take advantages of.
Deployment and Server Editions
How many total servers are needed? Which roles will be combined?
What edition of Windows will be used for each server (e.g., Standard, Datacenter)?
Will Server Core be used on any servers?
Where are each of the servers located (which of the two sites)?
How will the servers be deployed? Manual or automated?
Active Directory
Number of AD domains?
Will there be any Read-Only Domain Controllers?
How will the second site factor into domain controller placement? How will AD sites be configured?
How will AD organizational units be organized (considering how group policy will be used and users will be organized)?
DNS and DHCP
DHCP scope design (e.g., lease times, number of scopes, address range)
Will a form of DHCP fault tolerance be implemented?
Will DHCP reservations be used for servers?
DNS namespace design (e.g., domain name(s) chosen, split DNS for Internet/intranet, zones)
How will DNS be handled for the second site?
Application Services
How will applications be deployed? If using Group Policy, what are the details on how Group Policy will be used to deploy the software? Which software applications will likely be needed?
File and Printer Sharing
What shares might be needed?
DFS Needed?
How will quotas/FSRM be configures?
Assignment Requirements
At least one diagram must be included (not counted towards the minimum length described above); this could be a diagram describing Active Directory components, DHCP/DNS design, file share hierarchy, or anything else that is worth displaying graphically to enhance the reader’s understanding of the proposal. Additional diagrams, images, or tables are welcome.
The submission must cover all of the 6 major topics outlined above. Each choice should be explained with technical and business reasoning. The solution should be reasonably detailed. Additional topics may be covered as desired.
The structure of the final submission is flexible. There is no specific format required, although it should be organized logically and represent a single, unified solution. It is likely that the format will include separate sections for each of the 6 topics required, as well as a summary.
At least two non-textbook, non-Wikipedia reference is required; preferably, this would be a “best practice” guide or similar content from Microsoft or an experienced provider of Microsoft solutions.
Be sure to properly quote or cite any sources used. APA format is required for in-text citations and the list of works cited at the end.
Get Free Quote!
403 Experts Online